<div dir="ltr">Hi everyone.<div><br></div><div>Have you ever dealt with a 3-member Conservation Commission, in which one of the members has a conflict of interest with a proposed development needing an OOC and therefore has to recuse themselves? How have you handled this perpetual quorum issue?</div><div><br></div><div>Thanks for input/advice!</div><div><br></div>-- <br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><font color="#000000"><b><font face="arial, sans-serif">Marianne Iarossi, </font>AICP</b></font><div><font color="#000000"><a href="mailto:embeeplanning@gmail.com" target="_blank">embeeplanning@gmail.com</a></font></div><div><font color="#000000">413-454-8671</font></div></div></div></div>